VRF Installation and Commissioning

VRF Installation and Commissioning

VRF Installation

 

VRF Installation and Commissioning Services in Dubai. So, Nowadays Variable Refrigerant Volume systems have become increasingly more popular. We are warranty and service agents. We offer installation, commissioning, maintenance service and repairs in Dubai.

CONTACT NOW

 

HVAC Service

Our Service department’s focus is to manage our clients HVAC assets. So that they can concentrate on their respective roles without the added worry of managing the comfort conditions, energy requirements of modern commercial buildings and industrial sites.

 

 

 

Commissioning

Commissioning

 

At Ali Haseki AC L.L.C. we operate our commissioning division from water balancing to air balancing to full building validation. We utilize the latest NATA certified electronic testing equipment for water balancing, air balancing, controls. tune ups and general commissioning of all HVAC plants to maximize their efficiency.

We are providing perfect VRF Installation and commissioning for air conditioning systems

 

Air conditioning offers benefits in terms of cooling and heating. But only if systems are commission correctly before they are put into use.

Although AC commissioning varies depending on the type of equipment installed and the application in hand.

The principle remains the same, with the same considerations applying throughout the duration of a project.

First, commissioning should not be left until the end of an installation. It needs to be consider throughout the system design process. as it is just as important as positioning the units correctly.

Suitable Commissioning

It is crucial to factor commissioning time into a project. So it is a system cannot be switched on until the process has been completed. Project/Building owners may be piling on the pressure and demanding units are activate as soon as possible.

But, without suitable commissioning, the system could be inefficient, develop faults – or even not function at all.

So we are always keep in mind that details, considering all of that conditions with project/building owners.

Indeed, many common issues associate with commissioning are usually related to time constraints. If a project has been rushed or has overrun. there may have been mistakes made during the installation process.

Such as incorrect wiring or configuration settings. In addition to any mechanical and electronic issues. it is equally important that everyone involved in a project is shown how to correctly adjust controls.

Addressing the system, to ensure that indoor and outdoor units “talk” to each other.

So that can be another problematic area. Especially in larger applications, where the process becomes more involve. The best time to address outdoor units, for example, is when wiring the system, as the covers will already be remove.

VRF Systems

As air conditioning technology has advanced; VRF systems, in particular, have become simpler to commission. However, it is still important to check all units are connecting and talking to the correct corresponding units in the system.

Otherwise there could be communication issues between external and internal units.

After all, nobody wants operators thinking they are adjusting the settings for a wall-mounted unit in one room. When they are actually reprogramming a ducting unit in a different area of the building.

Many systems now offer “auto-addressing” in addition to manual. But beware – this does not address in a logical way.

This can lead to adjacent rooms being wide apart on any numbering collateral. And adding an extra complication for service engineers to deal with. So here we are at that point. As we are always saying that;

We are here to help and provide best service